User manual Online version ↗

RTIndustry User Manual

RTIndustry monitors your computer numerical control (CNC) machine or your PLC in real time: it counts parts, measures times and calculates production efficiency. At the top of every screen you will find the ? Help button: it takes you straight to the explanation of that screen.

1First steps

What RTIndustry does and how to use it every day, in five minutes.

  1. The machine works, RTIndustry records. The software reads the machine state (running, paused, in alarm…), the part counter and, if an energy meter is installed, the consumption. You do not need to do anything: the data arrives by itself.
  2. Work is organized in work orders (WO). A work order is a job: what to produce and how many parts. You create it on the Work orders screen and start it by dragging it to "In progress". If the machine starts without an active work order, RTIndustry creates one by itself ("Job started by the machine") so that no parts are lost.
  3. The operator uses the HMI. The Machine HMI screen is designed for whoever is at the machine: parts made, scrap, status and big buttons.
  4. The supervisor checks the results. Telemetry, OEE, Reports, Energy and Alarms show how the shift is going and how past periods went.
The software always keeps working, even if you close the browser: data collection is done by a Windows service that starts with the PC. The browser is only used to view and to give commands.

How to open it

  • Double-click the RTIndustry icon on the desktop, or
  • right-click the RTIndustry icon next to the Windows clock → Open dashboard, or
  • from another PC or tablet on the network: address http://PC-NAME-OR-IP:1880.

Several machines on the same PC

Each RTIndustry installation follows one machine. To connect more machines from the same PC or server, you install several instances: run the installer again, choose Install a new instance and give it a name (for example Mill2).

  • Each instance has its own folder (C:\RTIndustry-Mill2), Windows service (RTIndustry-Mill2), icon, data, backups and license.
  • The installer suggests free ports: the first additional instance answers on http://PC-NAME-OR-IP:1890, the second on :1900 and so on (you can see them on the Advanced page of the installer).
  • The instance name appears at the top next to the logo, on the sign-in page and in the browser tab title.
  • Each instance takes one seat of the license: with a multi-machine license you can use the same key in all of them.
  • To update them, run the installer and choose which instance to update; uninstalling one instance does not affect the others.

2Sign in

Everyone signs in with their own username and password: every operation is recorded under their name.

  1. Enter your Username and Password.
  2. Press Sign in. The work orders screen opens, or the page you were trying to open.

To leave: menu with your name at the top right → Sign out.

There are three types of account:

RoleWhat they can do
OperatorWork orders, HMI, telemetry, OEE, reports, energy, alarms, history. Cannot see Settings.
SupervisorLike the operator, plus managing Master data (customers, items, materials, bills of materials). The administrator creates or assigns this role in Operators and activity log.
AdministratorEverything, plus Settings, license and Operators and activity log. The administrator account is created in the setup wizard.

Changing your password: menu with your name at the top right → My password. Enter your current password, then the new one twice (at least 8 characters).

Too many failed attempts: after 5 wrong passwords in a row for the same username, sign-in from that device is blocked for 30 seconds; each further error doubles the wait, up to 15 minutes. Other users can keep signing in. The message on the page tells you how long to wait.

Forgot your password? The administrator can set a new one from Operators and activity log. If the administrator has forgotten theirs, contact support.
Do not use a colleague's account and do not share your password: the activity log attributes every operation to the account it was made with.

3Setup wizard

It appears only the first time, right after installation: in six steps the software is ready.

  1. Company — company name (required), plant, department, machine name and time zone (for Italy Europe/Rome; daylight saving time is automatic).
  2. Machine — choose the connection type: OPC UA, FANUC, Heidenhain, Modbus TCP or Simulator (test data, no machine). Enter the IP address and press Test the connection: the green "Machine connected" box confirms that state and parts are coming in. If the machine is off you can go ahead and try again later from Settings. If you have the profile of an identical machine that is already connected, press Import profile: you only enter the IP address and the machine is configured.
  3. Shifts — start and end times of each shift (night shifts too).
  4. License — enter the key (format XXXX-XXXX-XXXX-XXXX) and press Activate license. Without a key a 30-day free trial starts. The box shows the result and the remaining days. If the company reaches the internet through a proxy, enter its address (and, if required, username and password) under Advanced options.
  5. Administrator — username and password (at least 8 characters) of the first administrator.
  6. Start — check the summary and press Start RTIndustry.
You can close the browser halfway through: when you open it again, the setup resumes from the step you had reached. With Back you return to the steps already completed.

5Work orders

The job board: what needs to be done, what is in progress, what is finished.

What you see

Three columns: To do, In progress, Completed. Each card shows code, description, program, parts made and, if set, the due date (in red if overdue). The card being worked on updates by itself while the machine produces.

Creating a work order

  1. Press + New work order.
  2. Fill in at least the Description. Useful: Requested quantity (for progress), Target time (s/part) (for performance), Due date, customer, order, part number, program, operator, notes.
  3. Press Save: the WO appears in "To do".

Item and customer in a few taps

With Master data active, the form starts with the Item and Customer fields: type part of the name or code and pick from the list. As soon as the form opens, the Item field shows the items used last on this workstation.

  1. Tap + New work order.
  2. Tap the item: description, program, cycle time and usual customer fill in by themselves and the cursor moves to the quantity.
  3. Type the quantity and tap Create work order.

If the customer (or item) does not exist yet, type the name and tap + New customer «…» at the bottom of the list: it is created on the fly, marked to complete, and the office completes it later in Master data.

New work order form with item and customer chosen and quantity 50
Item picked from the recent ones: the rest filled in by itself.

Frozen bill of materials. When the work order goes into production, RTIndustry takes a snapshot of the item's bill of materials: if the bill changes later, this WO's consumption is still calculated on the original one. The supervisor or the administrator can update it with Realign to the item when editing the WO.

Not enough material. With Stock active, a warning appears when the WO starts if there is not enough material in stock for the parts still to be made. It is only a warning: production is never blocked.

Starting, pausing, completing

  • Drag the card to the column you want: in "In progress" it starts, in "Completed" it closes. On a tablet, press and hold the card for a moment before dragging it.
  • The card in progress has quick buttons: Pause/Start, Scrap +1, Note, Complete.
  • The icons on the card open the HMI of that WO, editing or deletion (with confirmation).

Cards with an item also show the material consumption (see Material consumption).

Only one work order at a time is in progress. When you start another one, the previous one is paused automatically: parts are always assigned to the right WO.

6Machine HMI

The operator's screen at the machine: large, readable, usable on a tablet even with gloves on.

What you see

  • The work order in progress (or the one chosen from the list at the top), with due date, shift and machine status.
  • The progress ring: good parts compared with the required parts.
  • The work order times: how long it was running, paused, stopped, in alarm, in set-up, maintenance, cleaning or rework, with the total.
  • The machine states pie: the share of time the machine was running, paused, stopped, in alarm, idle or off while the work order was active.
  • The production time (machine running), the expected time (target cycle × parts made), the deviation (late in orange, early in green), the average cycle and the estimated time to finish. Expected time and deviation appear when the work order has a target cycle.
  • Any active alarm, highlighted.

The work order status follows the machine

When the machine changes state, the active work order follows it: running → Running, pause → Paused, stop → Stopped, alarm → In alarm, set-up, maintenance, cleaning and rework → same state; machine switched off while the work order is running → Stopped. If you give a reason yourself (for example Maintenance while the machine is stopped), your choice stays until the machine changes state. The administrator can turn this off in Settings › State and mode mapping.

What you can do

  • Scrap: with + and − you record the parts that are not good. Good parts are updated accordingly.
  • Added parts: with + and − you add parts made that the machine counter did not count. They are added to the parts made of the work order (also for the ERP).
  • Set parts made: to realign in one go, tap Set next to «Parts made», type the number of parts made for the work order (for example the one shown by the CNC part counter) and confirm. The difference from the parts counted by the machine goes into the added parts; the number cannot be lower than the parts already counted by the machine (use scrap for the parts that are not good). It also works with CNCs whose part counter never resets, because only the work order total counts. Every change stays in the activity log with the previous value.
  • Work order status: buttons Start, Pause, Stop, Set-up, Rework, Maintenance, Cleaning, Alarm, Complete. Giving the reason for a stop makes the reports more accurate.
  • Send program to machine: opens the part program folder (the work order's program is highlighted at the top). You can enter subfolders, search, open or download a file, upload one from your device and press Send to machine: the program is copied to the CNC network folder or, on Heidenhain controls, transferred directly to the CNC. It works from any connected PC or tablet.
  • Machine documents: opens the machine documents folder (manuals, sheets), if configured.
  • Attachments: Attach document adds drawings, instructions or other files to the work order; Take photo uses the tablet camera. Attachments open with a tap and are deleted by pressing the bin twice.
  • Notes: write a note for the next shift and save it.

7Telemetry

How the current shift is going, updated every second.

  • Parts / hour: production rate of the shift.
  • Average cycle: running time divided by the parts produced.
  • OEE: overall efficiency of the shift (see OEE).
  • Shift energy: consumption since the start of the shift (if an energy meter is installed).
  • Chart of the power over the last hour, breakdown of the shift's time by state and CNC details (program, feed rate, tool…).

8OEE

The international indicator of a machine's efficiency: 100% means always producing, at the expected speed, with no scrap.

OEE = Availability × Performance × Quality

FactorQuestion it answersHow to improve it
AvailabilityFor how much of the shift did the machine work?Reduce downtime, long set-ups, waiting.
PerformanceDid it work at the expected speed?Set a realistic target time in the WO; reduce micro-stops.
QualityHow many parts are good?Record and reduce scrap and rework.

The page shows the shift OEE (circular gauge), the three factors, the weekly trend (Monday → Sunday) and the breakdown by shift for the day.

Performance is calculated only if the work order has a target time. Without one, it is 100%.

9Reports

The analysis of a past period: a week, a month, a specific shift.

  1. Choose the period and, if you like, the shift in the filters at the top.
  2. Read the summaries: Average OEE, Good parts, Scrap, Energy.
  3. Below you find the OEE day by day, the time distribution (production, pause, idle, stopped, alarm, maintenance, set-up), energy compared with production and the list of completed work orders.
  4. With Export CSV you download the data for Excel.
  5. At the bottom, the Material consumption section summarises the material used by the work orders completed in the period: see Material consumption.

10Energy

How much the machine consumes and how much each part costs. Available if an energy meter is connected.

  • Real time: power drawn, shift energy, energy per part (Wh/part) and shift cost.
  • Period history: total energy and cost, daily average, day-by-day consumption and the trend of Wh per part.
  • By machine state: the energy of the period split between production, idle (program end included), stopped or paused, in alarm, set-up and other (maintenance, cleaning, unmapped states), with kWh, share, hours, average kW and cost of each state, and the chart of the daily consumption by state. Highlighted, the energy with the machine not producing (idle, stopped, in alarm): how much the machine uses while on but not producing, its average power and the monthly cost (average of the days with data × 30). A high power while not producing points to loads left on: coolant pumps, extraction, heating. The data is recorded from the update to the version that introduces it: earlier days have no breakdown, and the page shows from when it is available.
  • By item: for each item code of the work orders completed in the period, energy and cost, Wh per part, energy cost per good part (the energy used for scrap has to be paid for too) and deviation from the work order's target energy (green if consumption is below target, red if more than 5% above). Tap an item to see the trend order by order and find out whether a batch cost more than the others. Export CSV for quotes and analysis in Excel.
Work orders with no recorded energy (machine without a meter at that time) count in orders and parts but are left out of the averages, so they do not lower the Wh per part.
The cost uses the energy price set in Settings › Services, energy and license (euros per kWh).

Printable report

The Printable report button next to the period opens an A4 document for the chosen period and shift: total energy, cost and CO2 and per part, energy and monthly cost with the machine stopped, chart of day-by-day consumption and by state, table by state and table by item (the 40 items with the highest consumption; the full list is in the CSV export). Press Print or save as PDF to print it or save it as a PDF to attach to a quote or show in a meeting. The report is in the interface language.

CO2 per part

If you set the emission factor (kg of CO2 equivalent per kWh) in Settings › Services, energy and license, the Energy page also shows CO2: for the period and per part in the history, per part in the current shift, per state and per month with the machine stopped, per good part of each item and each order; the CO2 columns are also included in the CSV export. Useful when a customer in your supply chain asks for the carbon footprint of the parts you supply.

Use the official national factor for electricity consumption (for Italy, published every year by ISPRA) or the one stated on your supplier's bill (for example with certified renewable energy). As long as the field is empty, CO2 is not calculated: better no figure than a made-up one.

Connecting the energy meter

In Settings › Energy meter (Modbus) choose the meter model: the fields fill in by themselves and remain editable. For the IME CE4DT MID (Conto D4) the profile sets function FC4 (input register), unit ID 5, register 20592, type uint32, order ABCD and scale factor 100: you only need to enter the IP address. For other models choose Custom and copy register, data type and register order from the meter's manual.

RS485 meter with an Ethernet converter (e.g. USR-DR302): if the converter forwards the bytes as they arrive (transparent mode) choose the Modbus RTU over TCP (RS485 converter) protocol and the TCP port configured on the converter; if the converter performs the Modbus TCP → RTU conversion keep Modbus TCP. Not sure? Press Test reading: if the meter only answers with the other protocol, RTIndustry suggests it with the value read and you apply it with Use this protocol. Baud rate, parity and stop bits of the converter serial port must match those of the meter.

The scale factor converts the value read into Wh (watt-hours), the unit RTIndustry uses for all its calculations: a meter that counts in kWh → factor 1000; in 0.1 kWh (like the IME) → 100; already in Wh → 1. Press Test reading: the result appears in Wh and in kWh and must match the total shown on the meter's display.

If you copy the factor 0.1 from the meter's notes (which reason in kWh), consumption comes out 1000 times too low: with the IME the right factor is 100.

11Alarms

How long the machine has been in alarm and for what causes.

  • Filters by period and shift.
  • Summaries: time in alarm, days with alarms, percentage of machine time, daily average.
  • Daily chart with the average line, breakdown by shift and event table: alarms longer than 5 minutes are highlighted.
  • Export CSV for analysis in Excel.
Only alarms lasting at least 5 seconds are recorded: momentary warnings do not distort the statistics.

12WO history

The complete archive of all work orders, including old ones.

  • Search by code, description, customer, part number…
  • Filter by status and sort by clicking a column header.
  • Export CSV downloads exactly the list you are looking at.

13Master data

The company list of customers, items, materials and item types, with the bill of materials of each item: which materials a piece is made of and how much of each.

  • Customers: the only required field is the name. The VAT number can be written with or without the country prefix. Search finds the words in any order and ignores case, accents and dots: «rossi srl» finds «Meccanica Rossi S.r.l.».
  • Materials: each one has a consumption unit (the one used in the bill of materials, e.g. m²) and a purchase unit (the stock unit, e.g. kg). When they measure different quantities you enter the conversion: «1 m² of this sheet = 15.86 kg». For sheet metal the Use button calculates kg per m² from thickness and material. Between units of the same quantity (g and kg, mm and m) the conversion is automatic. Available units: pz (pieces); g, kg, t; mm, m; mm², m²; cm³, dm³, l, m³.
  • Item types: they describe the nature of an item with its data (a turned part has diameter and length, a sheet has thickness and finish). There are five starting types (Turned part, Milled part, Cut sheet, Tube / profile, Assembly) that you can change; each field can be a number with a unit, a text, a choice from a list or yes/no.
  • Items: code, description, type with its data, usual customer and the values proposed in the work order (program, cycle time, energy). In the bill of materials you enter the quantity of each material for one piece, in its consumption unit, with the scrap percentage; the preview shows how much material is needed, for example, for 100 pieces.
  • To be completed: customers and items created on the fly or received from an external system only have the minimum data. The Only to complete filter lists them; saving them from the full form removes the mark.
  • Duplicates: open the record to keep and, at the bottom, search the duplicate and press Merge. The duplicate is deleted, the items and work orders using it move to the kept record and missing data is taken from the duplicate.
  • Excel: the CSV button exports the list (and, for items, the bills of materials) and imports it. On import RTIndustry first checks the file and shows the rows with errors; then it saves only the valid ones. Records with an existing code are updated.
Item form with type, attributes, values proposed in the work order, bill of materials and material preview for 100 pieces
An item with its bill of materials: 0.35 m² of sheet with 8% scrap and one gasket per piece.

After the update: customers and items from existing work orders

If you already used RTIndustry, customer names and part numbers are written in the work orders. When the page opens, a message offers Create and link: RTIndustry creates one customer for each name and one item for each part number (no duplicates, marked to complete) and links them to the work orders. The same command is in the CSV menu › Create from existing work orders. The work order texts do not change.

CSV files for Excel

The first row holds the column names, as RTIndustry exports them: to start, export the list (even empty) and use it as a template. Bills of materials have one row per material:

ItemMaterialQuantity per pieceScrap %Note
FL-DN80LAM-304-200.358laser cut
FL-DN80GUA-EPDM-8010
When importing bills of materials, the bill of every item in the file is replaced entirely; an empty cell clears the field. Excel saves CSV files both in UTF-8 and as "CSV (delimited)": RTIndustry reads both.
Everyone can view master data; only the supervisor and the administrator can change, merge and import it. A material used in a bill of materials cannot be deleted and its consumption unit cannot change; an item type used by an item cannot be deleted.

14Material consumption

How much material each work order used and what it cost, calculated from the bill of materials and the parts made.

How it is calculated

Parts made = parts from the part counter + parts added by hand. Scrap is already included: the machine counts every part, good or scrapped.

Consumption = quantity per piece × parts made × (1 + scrap). It is then converted into the purchase unit and multiplied by the material's unit cost.

Example: flange with 0.35 m² of sheet and 8% scrap, 53 parts made → 0.35 × 53 × 1.08 = 20.03 m² → at 15.86 kg/m² = 317.7 kg → at €4.20/kg = €1,334.51.

Where you see it

  • Work orders: on the card, the main material with the consumption so far and the expected one for the whole quantity (+1 means more materials).
  • HMI: the Material box with every row of the bill and the material cost.
  • WO history: the Material and Material cost columns.
  • Report: the Material consumption section for the period, grouped by material, customer, item, work order or workstation.
Work order board: the cards show the sheet consumption so far and expected
On the card: 4.5 m² of sheet used out of 18.9 m² expected for 50 parts.

Report: actual against expected

For each material the Report shows the Expected quantity (bill × requested parts) and the Deviation: in orange when more than 5% above the expected. With the company archive the report includes every machine in the company and can be filtered or grouped by workstation. Export CSV downloads the data for Excel, Print / PDF opens a page to print or save as PDF.

Material consumption section of the Report with consumption, expected and deviation
84 parts made out of 80 requested: consumption 5% above the expected.
Report consumption comes from completed work orders. A material without a unit cost makes the cost "partial". A work order closed before making all the requested parts has a negative deviation. Work orders closed before version 2.7 have no expected value ("—").

Consumption also reaches the management system: when each work order closes, through REST, in the readconsumi table and on the MQTT topic {serial number}/consumi (technical details in the developer documentation).

15Stock

Material stock levels, with goods-in, stocktake and automatic issue for every closed work order. It is in Master data › Stock, if the module is included in the license.

Stock tab with the material stock levels and the Goods-in, Adjustment, Stocktake and Movements buttons
Stock levels with the Below minimum and Goods-in missing marks.

Who manages the stock

  • RTIndustry: when each work order closes, the material used is issued automatically. If the WO is reopened the issue is reversed, and the updated consumption is issued at the next closure.
  • The ERP system: RTIndustry calculates and sends the consumption, the ERP issues the stock. Nothing is issued twice.

Goods-in, adjustment, stocktake

  • Goods-in: choose the material, type the quantity and, if you like, delivery note and lot. The quantity can also be typed in the consumption unit (for example m² for sheet): RTIndustry converts it into the stock unit.
  • Adjustment: a correction with a sign (+ or −), with a note on the reason.
  • Stocktake: print the Count sheet, count and type the quantity only for the materials you counted; RTIndustry records the difference from the calculated stock.
  • Movements: the history of goods-in, issues, reversals, adjustments and stocktakes, with date, workstation, user, delivery note and lot.
Below minimum: stock is below the minimum set on the material. Goods-in missing: stock is negative, i.e. more was issued than received; record the missing goods-in or do a stocktake. Production is never blocked by the stock.

Everyone can view it; goods-in, adjustments, stocktake and the choice of manager belong to the supervisor and the administrator. With the company archive the movements of every machine add up: stock is the company's.

16Company archive

Customers, items, materials, bills of materials, consumption and stock movements shared by all the machines of the license. It is activated in Settings › Company archive (administrator).

Not even we can read your data

Data leaves each workstation encrypted with a key only your company has. The Site Manager stores it and forwards it to the other machines but cannot read it: it only sees unreadable blocks, the date and the number of records. Without a network you work on the local copy and changes are sent when the connection is back; if two people change different fields of the same customer, the changes are merged.

Company archive section of the Settings with the recovery code and the button to activate the archive
Settings › Company archive on a workstation not connected yet.

First machine: activate

  1. Press Activate the company archive: RTIndustry creates the company key.
  2. Print or save the recovery sheet straight away (Open the sheet to print): it holds the recovery code and a QR code. Keep it like a house key. You can also download the key file (.rtikey).
  3. Confirm with Done: I printed or saved the sheet.

Other machines: connect

On the other workstations of the same license, in the same section, type the recovery code (upper/lower case and dashes do not matter) and press Connect this workstation, or use From .rtikey file. Master data arrives straight away; any data the workstation already had is merged with the company's.

The cloud in the top bar shows the status: synchronised, changes waiting, no network or error. Synchronise now forces sending.

If the recovery code is lost and every machine breaks, the archive data cannot be recovered: we do not have the key. The local copies on the machines and the backups stay readable anyway.

Advanced operations

They are enabled by typing CONFERMO: Change the key (afterwards the other workstations reconnect with the new code), Disconnect this workstation only, Deactivate for the whole company (the Site Manager deletes the archive after 30 days; the data stays on every workstation).

17Settings

The whole configuration of the software, reserved for the administrator. Changes apply immediately, without restarting anything.

At the top of the page there is the Self-diagnosis: with Start self-diagnosis RTIndustry checks the machine connection, license and PC and tells you what to do for each problem. See Problem solving.

At the top you find the connection status with the machine (ONLINE in green) and the Test connection button. With Test the changes before saving you check a new address or protocol without touching the one in use.

SectionWhat it is for
Machine and protocolConnection type (OPC UA, FANUC, Heidenhain, Modbus, Simulator), IP address, security. When you change protocol, the previous configuration stays saved.
Machine variablesWhere to read state, parts, program, alarms… from (usually suggested automatically by the profile). Next to each variable you see whether it is assigned or not assigned; with Modbus also whether the name matches no register. Sources are assigned with one tap from the OPC UA tree, the Modbus register table or the Fields read from the machine list (FANUC and Heidenhain): each variable shows whether it is already assigned to that source, to another one (and which) or free.
State and mode mapping · part counterHow to translate the machine's values into RTIndustry states; how to count parts.
Energy meter (Modbus)Connection to the energy meter (model, register, type and order, scale factor in Wh), with a test reading: see Connecting the energy meter.
Work shiftsShift times.
Identity and accessCompany and machine details.
Services, energy and licenseDatabase and backup, energy price, time zone, license (activation and deactivation), Site Manager address and company proxy (if the PC reaches the internet through a proxy).
Work order integration (ERP, MES)Receiving work orders from the management system. With Automatic registration in master data the new customer and item codes coming from the management system are created to complete; when it is off, work orders still arrive but are not linked.
Company archiveMaster data, consumption and stock shared between machines, encrypted with the company key: see Company archive.
Asset data (hyper-depreciation)Machine identification, delivery and commissioning dates and network data for the expert's dossier: see Asset data.
Folders and transfersFolders for attachments, part programs, machine documents and the CNC network folder (where "Send to machine" copies the programs); program folder of Heidenhain controls. The folder button opens it in the browser, even from another PC: you can browse it, open and upload files. On the PC where RTIndustry is installed there is also Open in File Explorer; on other PCs Copy path. For network folders use the full path (\\server\share, not a mapped drive letter) and install the service with a user that can access it (installer › Advanced).

After making changes press Save: if you changed the machine connection, a connection test starts by itself.

Asset data (hyper-depreciation)

The Italian hyper-depreciation sworn appraisal requires proof that the machine is interconnected. Every day RTIndustry keeps the interconnection log by itself (connected time, instructions received from the management system and data sent, programs, orders, parts, alarms) and never deletes it. In Settings › Asset data (hyper-depreciation) the administrator adds what RTIndustry cannot know: manufacturer, model, serial number, year of manufacture, numerical control, description, delivery date, commissioning or acceptance date, invoice number and date, Annex IV item (indicated by the expert) and internal contact. If a machine profile has been applied, manufacturer, model and control are already suggested. All fields are optional; the section header shows how many of the 6 essential data you have filled in. Press Save asset data: the save is kept in the activity log.

The network data (protocol, machine address, workstation, workstation code in the licence, active management-system channels) come from the configuration and are not typed in. The MAC address identifies the machine on the network: Read from the network finds it if the machine is on the same network as the PC; otherwise read it on the nameplate or in the CNC's network settings and type it in. At the bottom you find the key dates of the log: first connection and first two-way interconnection (when the management system has sent at least one instruction and received at least one piece of data). Assessing the requirements always remains the expert's job.

Interconnection dossier for the appraiser

At the bottom of the Asset data section, the Interconnection dossier box prepares the document to hand to the appraiser. Choose the period (suggested: from the start of the log to today) and the language, then press Generate the dossier: an A4 document opens, ready to print or save as PDF with Print or save as PDF. If you have changed the asset data, save them first: the button stays disabled while there are unsaved changes.

The dossier contains: the asset and company data; the summary (first two-way interconnection, days recorded, days with two-way exchange, connection hours and interruptions); the machine ↔ RTIndustry ↔ management system diagram with the active protocols and channels; the Annex IV requirements (5 mandatory and 3 additional), each with the evidence collected and an empty box for the appraiser's assessment; a sample of the latest instructions received from the management system and of the data sent (only date, channel, action, work order and result, never the content); continuity day by day or month by month; the monitored parameters; the SHA-256 fingerprint of the content. The dossier is a supporting document: checking the requirements is always up to the appraiser, and RTIndustry does not certify the conformity of the asset.

Every generated dossier stays saved with a number (e.g. RTI-D-2026-0001) and can be reprinted unchanged from the list with Open. To check that a dossier you are shown has not been altered, open Verify a dossier, enter number and fingerprint and press Verify: if the fingerprint does not match, the document has been altered. Only the administrator generates and verifies dossiers.

Maintenance over the years. The hyper-depreciation benefit is kept only if the machine stays interconnected. For this reason RTIndustry: at the end of every half-year (30 June and 31 December) saves a half-yearly report by itself (number RTI-S-…) in the dossier list, in the dossier data folder and, if configured, in the backup copy folder; from 1 to 20 January and from 10 to 30 June shows the administrator a reminder of the periodic notifications (always check the deadlines with your advisor); if the machine has not responded for longer than the configured threshold (48 hours by default, 0 = off) shows an alert at the top and records it in the timeline. Alerts can be closed with the × until the next day.

Machine profile: copying the configuration to an identical machine

When two or more machines are of the same type (same manufacturer, model and controller), you configure them only once. On the machine that is already connected and tested, in the Machine profile box press Export profile, give it a name (for example Mazak QT 200 lathe · FANUC 0i-TF), manufacturer, model, controller and a few notes for whoever will use it, then Download the profile. The file (.rtiprofilo.json) contains protocol, variables, state mapping, part counting, rules and energy meter, but no IP address, no password and no company data: it can be kept and shared.

On the other machine press Import profile, choose the file, enter the machine's IP address (and the energy meter's, if any: leave it empty if this machine has none) and press Use this profile. The Settings are filled in: press Test the changes before saving and then Save and apply. The saved configuration is always exported; if the OPC UA connection is secured, the user name and password must be entered by hand.

Profile library. With Library you pick a ready-made profile without needing the file: the RTIndustry official catalog (profiles checked by us; those with the Field-tested badge have already been tried on a real machine) and, if your reseller has the private library, the reseller's profiles, visible only to its installations. Search by manufacturer, model or controller, press Use, enter the IP address and continue as with a file. An active license and an internet connection are required. If your machine is missing, publish it yourself (see below).

Publishing to the library. After connecting and saving a machine, press Export profile, fill in name, manufacturer, model, controller and notes, choose where to publish it and press Publish to the library. The saved configuration is published, without IP addresses or passwords. In the official catalog the profile stays Under review until RTIndustry checks it; in the reseller library (if active) it is visible right away to the reseller's installations. If you have already published that machine, under Publish as choose New version of…: the entry is updated instead of duplicated. The status (Under review, Published, Rejected with the reason) is shown in Library › My publications.

How parts are counted

RTIndustry counts parts in one of these ways, chosen in Settings › State and mode mapping · part counter:

  • Machine part counter (recommended): the software reads the control's counter (FANUC, SINUMERIK actParts, OPC UA variable or Modbus register).
  • At program end (part counter calculated from the program): when the machine does not provide a part counter, each direct transition from Running to Program end counts as one part. It is the default mode for Heidenhain (program end recognized by M30, M2/M02 or END PGM) and can be enabled on SINUMERIK with the acProg profile if actParts stays at 0. A reset after a stop (program aborted) does not count.
  • PLC counter (Heidenhain): if the NC program or the PLC keeps a counter, enter its path and the data access password; it works like the machine part counter.
Counting at program end reads the machine at intervals (usually every 5 seconds): if the operator restarts the cycle before the next reading, that part is not seen. With very short cycles or continuous cycles use the machine part counter or the PLC counter. When the software measures cycles shorter than three readings, the Short cycles warning appears in Settings.

SINUMERIK: the acProg (field-proven) profile uses the control's native nodes; the progStatus profile remains for controls that expose only that. With Detect the controller type the software suggests by itself the profile that responds.

Automatic scan (OPC UA): in the node explorer, Automatic scan reads the whole machine tree (names, types, units and a few values) and proposes the node of each variable, with the confidence (High, Medium, Low) and the reason (Why?). Everything happens on the PC, without internet. Low-confidence proposals are not selected: tap an alternative, None or Find another node, check with Test read and then Apply (nothing is saved until you save). If the tree matches a known or library profile, the software proposes it directly. With Save as profile the confirmed mapping becomes a file to import on the next identical machine by entering only the IP.

Backup: every day RTIndustry saves a copy of the database in its own folder (last 7 days plus the last 4 Sundays). In Services, energy and license → Copy backups to another disk or network location you can set a second folder (for example D:\RTIndustry Backup or \\NAS\backup): this way, if the PC's disk fails, the history is not lost. Press Back up now: the folder you typed is saved and the message says where the backup was copied, or why the copy failed.

For a network folder: the RTIndustry service runs with the PC's system account, so the share must give write permission to the computer (in a domain: PC-NAME$) or the service must be installed with an account that has access to it. If in doubt, use a second disk or a USB stick that is always connected.
Deactivating the license frees the seat for another PC, but stops data collection on this one until you reactivate it.

18Operators and activity log

For the administrator only: personal operator accounts and the log of all operations (who did what and when), with the timeline that brings together operator, machine, program and ERP.

Creating an operator account

  1. Menu + → Operators and activity log.
  2. Enter the Username (e.g. john.smith: letters, numbers, dot or hyphen), Full name and an Initial password of at least 8 characters.
  3. Press Create operator and give the password to the operator in person: they can change it from My password.

Managing accounts

ButtonEffect
EditChanges the full name or sets a new password (forgotten password).
Disable / Re-enableSuspends access: the operator is signed out immediately, even if they had the page open. Their activities remain in the log.
DeleteDeletes the account. The activities remain in the log. For a temporary absence, Disable is better.

Timeline (audit)

Puts everything that happened on the workstation in a single list, in time order: what the operator did, what happened to the machine, what RTIndustry decided and what the connected ERP systems requested. Use it to reconstruct a reported problem («at 10:15 the part counter reset», «the work order went to Paused by itself») without asking anyone to remember what they did. It is always on, has no settings and only the administrator can see it. It is kept for 35 days.

Timeline with the filters, the source buttons with their counts and a machine row opened with the values at that moment
A machine row opened: the event details and the values received from the machine at that instant.
SourceWhat appears
OperatorThe same operations as the activity log (sign-ins, work orders, master data, stock, settings…).
MachineChanges of status, mode and program; connection lost and restored (with the duration); finished alarms with their duration; part counter anomalies: reset, decreased, jump of more than 50 parts, non-numeric value. Normal increments do not appear.
ProgramRTIndustry's decisions: work order in progress and why, automatic work order created because the machine was working without a job, work order status changes, parts counted minute by minute, shift change.
ERPThe calls received from the connected ERP systems, with the result.
SystemService start and stop, license, saved settings (names only, never values), backups, service warnings and errors (at most 200 a day).
  1. Choose the period with From and To (at most 31 days) and, if needed, a User or a Work order code, then press Filter. With a user selected you only see that user's actions.
  2. Tap the source buttons to hide or show them: the number beside each one says how many entries there are in the period.
  3. Tap a row for the details. Machine values at that moment shows the last value received for each variable at that instant, with the time it arrived: useful to see, for example, what the machine was saying when the part counter jumped.

The values «black box». To show the values of a past moment, RTIndustry saves the values received from the machine, but only when they change: status, mode, part counter, program and alarm at every change; other variables at most every 10 seconds and only if they change by more than 1% (those that always rise slightly, like the energy counter, once a minute); plus a full snapshot every hour. Nothing is saved while the machine cannot be reached. The limit is 200,000 rows a day: beyond that, only the main variables and the hourly snapshot are saved. It has no settings.

Audit package for support

Download package creates a ZIP file for the period chosen with From and To (at most 31 days), to send to support to analyse a problem. It contains: the timeline (CSV to open in Excel, and JSONL), the changes in the machine values, the settings without passwords, the program diagnostics and a summary with the counts; the LEGGIMI.txt file explains the rest.

Operator names are replaced by «operatore 1», «operatore 2»… (the same person has the same number throughout the package, logs included), and account first and last names are hidden. The Include operator names (internal use only) box keeps them: use it only for an analysis inside the company. Every downloaded package stays in the activity log («Audit package downloaded»).

Always send support only the package without names: names are not needed to analyse a technical problem.

Weekly packages. Every Monday from 03:00 RTIndustry automatically saves the package of the previous week (Monday to Sunday, without names and without diagnostics) in C:\RTIndustry\data\audit\ and, if the backup copy to another disk is set, also in the audit subfolder of that folder. If the PC was off, it is created as soon as possible. The last 8 weeks are kept. You find them below the filters, under Weekly packages saved automatically, ready to download.

Informing operators (privacy)

The timeline also records what people do. In Italy, article 4 of the Workers' Statute and the GDPR (the EU General Data Protection Regulation) allow tools of this kind for technical and organisational needs, but workers must be clearly informed and the data may only be used for the stated purpose; similar rules apply in other countries. Before using RTIndustry with personal accounts, give operators a written notice and have the text checked by the company's employment adviser or data protection officer. A sample to adapt:

Notice about the RTIndustry operations log

RTIndustry, the program used to follow production on the machine, records the operations performed with your account (sign-ins, work orders, settings) together with the machine events, with date and time.

Why: only for technical and organisational needs: reconstructing and fixing malfunctions, counting errors and production problems. The log is not used to assess people's performance or to monitor their activity.

Who sees it: only the program administrator in the company. External technical support only receives data with names replaced by numbers.

How long: 35 days, then the data is deleted automatically; weekly summaries without names are kept for 8 weeks.

Your rights: you can ask to see the data concerning you and get more information from [name and contact of the controller or data protection officer].

Activity log

Lists, most recent first, every operation performed in the interface: sign-ins (including those rejected for a wrong password), sign-outs, creation, editing, moving, status changes, scrap and deletion of work orders, account management, saving of settings. For each one: date and time, user, activity, work order and details.

Filter by period (From / To), User and type of Activity, then press Filter. Export CSV downloads the filtered entries (up to 1000) to a file that opens in Excel.

The log cannot be edited or deleted from the interface. In the CSV file, date and time are in UTC (Italian time minus 1 hour in winter, minus 2 hours in summer).

19Machine and work order states

StateMeaning
RunningThe machine is producing.
PausedTemporary pause.
StoppedMachine stopped.
In alarmThe control is signalling an alarm (or the operator reports it with the Alarm button): it applies to both the machine and the work order.
Idle · Program endSwitched on but not working; Program end when the program has reached its end (the time counts as idle).
Set-up · ReworkPreparing the machine; machining parts that must be redone.
Maintenance · CleaningPlanned stops.
CompletedWork order closed.
Off or unreachableNo data from the machine for more than 15 seconds: switched off, cable disconnected or no network.

20Using a tablet

From the menu with your name at the top right:

  • Tablet mode (large buttons): bigger buttons, suitable for touch and gloves.
  • Large text: characters easier to read from a distance.
  • Keep screen on and Full screen, where the device allows it.
In the tablet's browser you can use "Add to Home screen": RTIndustry then opens like an app, in full screen.

21Notification area icon

Next to the Windows clock there is the RTIndustry icon. Its color tells you at a glance whether everything is fine:

  • Green — service running and license valid.
  • Yellow — configuration to be completed or a warning (e.g. license about to expire).
  • Red — service stopped or license not active.

With a right-click: installed version, service and license status, Open dashboard, Settings, Stop service/Restart service, Show log.

With several instances on the same PC there are several icons, one per instance: the instance name appears in the menu and in the tooltip when you hover over it (for example RTIndustry Mill2). The icon is also used to open the attachment and program folders from Settings: if it is closed, it reopens at the next Windows sign-in.

22License and messages

The license is verified over the internet with the Site Manager and is managed from Settings (administrator only). If the license is not active, operators see the Service suspended page and must contact the administrator.

If the connection is missing, RTIndustry keeps working normally and retries by itself: the license remains valid for a few days even without internet (temporary offline operation notice), then the connection is needed again.

Several machines

Each installation (instance) takes one license seat. With 8 machines you need 8 seats: usually a single key with 8 seats, entered in all the instances. The Site Manager shows how many seats are in use.

License modules

Some features are modules that the license may or may not include: Master data (with bills of materials and consumption), Company archive and Stock. Your reseller sets them. If a module is not included, its menu item does not appear and anyone trying to use it sees "The … module is not included in the license"; data already entered is not deleted and becomes visible again when the module is reactivated. Without Master data, work orders are created as before, with text fields, and those from the management system keep arriving.

Moving the license to another PC

On the old PC: Settings › Services, energy and license › Deactivate this installation (frees the seat). On the new PC: install RTIndustry and enter the same key in the setup wizard. If the old PC no longer works, ask support to free the seat.

MessageWhat to do
Trial period: N days remainingNothing. To continue after the trial, the administrator enters a key in Settings.
The license expires in N daysContact your supplier to renew it.
Site Manager unreachable: temporary offline operationCheck the PC's internet connection. If the company uses a proxy, enter it in Settings › Services, energy and license. Work does not stop.
License expired: read-only interfaceData can be viewed but not changed. Renew within 30 days.
License seats used upThe key is already in use on another PC: deactivate it there (Settings › License) or request an additional seat.
Installation deactivated / No active licenseEnter the key in Settings › Services, energy and license.
Inconsistent system clockCorrect the Windows date and time.

23Requirements, network and antivirus

The RTIndustry PC

  • Windows 10 (1809 or later) or Windows 11, 64-bit, 4 GB of RAM, 10 GB free; for several instances on the same PC allow about 100 MB of extra RAM for each machine (from 6 machines upwards 8 GB are recommended).
  • Always on: sleep = Never (while the PC is asleep no data is collected); Windows updates outside working shifts.
  • Correct date and time (shifts, reports and the license depend on the clock).
  • Connected to the network of both the machines and the tablets or PCs used to view the dashboard; internet (HTTPS to licenze.rtindustry.it) for the license.

Network ports

PortUse
1880Dashboard (browser of tablets and PCs). Additional instances use 1890, 1900… (see Several machines on the same PC).
1883MQTT for company systems (ERP, MES); additional instances 1893, 1903…
to the machinesFANUC 8193, OPC UA 4840, Heidenhain 19000, Modbus 502 (energy meter included).

The installation opens these ports in the Windows firewall by itself.

Antivirus with its own firewall (Avast, AVG, Kaspersky, ESET, Bitdefender, Norton…)

Many paid antivirus programs (and their trial versions) replace the Windows firewall: the rules opened by the installation no longer apply and the tablets cannot reach the dashboard, even though it opens normally on the PC. Some of them wrongly flag the RTIndustryTray.exe icon as suspicious (a false positive: it is a new program not yet known to the antivirus).

In the antivirus settings:

  • Exceptions / exclusions: add the C:\RTIndustry folder (and the C:\RTIndustry-… folder of each instance).
  • Firewall: allow incoming connections to the program C:\RTIndustry\node\node.exe (one per instance), or set the shop-floor network as private/trusted.
  • If the icon has been quarantined, restore it from the antivirus quarantine and restart the PC.

Servers and company PCs with centrally managed protection (EDR such as Cortex XDR, CrowdStrike, SentinelOne, Microsoft Defender for Endpoint): the icon RTIndustryTray.exe is often deleted without warning right after installation and never appears. The Self-diagnosis reports it ("Notification area icon"). Ask the IT department to exclude the RTIndustry folders, then reinstall choosing "update": data and settings are kept.

Always test from the tablet: open http://PC-NAME-OR-IP:1880. The C:\RTIndustry\strumenti\Verifica-RTIndustry.bat tool reports whether a third-party firewall is present on the PC.

24Troubleshooting

For a complete, guided check use the Self-diagnosis first (Settings › Start self-diagnosis).

The machine shows "Off or unreachable"

  • Check that the machine is switched on and the network cable is connected.
  • In Settings press Test connection: the message tells you what is wrong (address, port, credentials).

The part count does not increase

  • Check that there is a work order In progress and that the machine is Running.
  • In Settings › State and mode mapping · part counter check the part counter variable.
  • If the machine's part counter does not move (for example it stays at 0), enable counting at program end: see How parts are counted.

The page does not open

  • Look at the notification area icon: if it is red, right-click → Restart service.
  • From another PC: check that you are using the right address and port 1880 (additional instances: 1890, 1900…).

The dashboard opens on the PC but not on the tablets

  • It is almost always the antivirus firewall: see Antivirus with its own firewall.
  • Check that the tablet and the PC are on the same network (or that the company network allows the connection).

The antivirus flags RTIndustry

  • It is a false positive: add the exceptions described in Antivirus with its own firewall and restore the file from quarantine. Data collection (the service) continues even without the icon.

The "Short cycles" warning appears in Settings

  • With counting at program end some parts may be missed because the cycle is shorter than three readings: use the machine part counter or a PLC counter (see How parts are counted).

Consumption looks 10, 100 or 1000 times wrong

  • The energy meter scale factor is not right: the value must come out in Wh. See Connecting the energy meter and compare the reading with the meter's display.

Error codes

CodeMeaning and solution
RTI-E001The software does not start on this PC (folder copied from another PC, or PC name changed or Windows reinstalled). Reinstall RTIndustry: the data is kept.
RTI-E011Port 1880 is taken by another program (for example the previous version). Close the other program or change the port.
RTI-E020 / E021Database problem. Contact support: automatic daily backups exist.
RTI-E030Installation identity cannot be read: the license must be reactivated. In Settings › License and Site Manager enter your key (the same one as before is fine) and press «Activate» while the Site Manager is reachable; then re-enter the saved passwords (OPC UA, MySQL, Heidenhain, proxy).
RTI-E004PC identifiers cannot be read right now: the service restarts by itself. If it happens again, restart the PC.

25Problem solving (Self-diagnosis)

Before calling support: Settings › Start self-diagnosis (at the top of the page, administrator only). In less than a minute RTIndustry checks the connection to the machine, the license and the PC and, for each point, tells you what it checked and what to do.

Each check has a traffic light: green passed, yellow works but needs fixing, red problem, grey not checked (a problem above must be fixed first). Follow the red checks from top to bottom: often, once the first is fixed, the others are fixed too. The Guide button next to a check opens the matching entry below.

Self-diagnosis also works with a blocked license, does not change any setting and is recorded in the activity log. If the problem persists after the suggested actions, press Export diagnostics and send the file to support.

Machine address

Checks that the machine address is set and, if it is a name, that the network recognises it.

  • Address missing: in Machine and protocol enter the IP address of the control (shown in the network settings of the CNC or PLC) and save.
  • Name not recognised: use the IP address directly (for example 192.168.1.50).

Network connection to the machine

The PC tries to open the protocol port: OPC UA 4840, Modbus TCP 502, FANUC FOCAS 8193, Heidenhain DNC 19000 (or the configured one).

  • No response: the machine is off, the cable is unplugged, the address is wrong or PC and machine are on different networks. Switch the machine on, check cable and socket lights, compare the address with the one on the control; the PC must have an address on the same network (for example both 192.168.1.x).
  • Port closed: the PC reaches the machine, but the control's communication service is not active or uses another port. On the control check the option (FOCAS Ethernet, OPC UA server, DNC/Remo Tools, Modbus TCP) and the port. After power-on some controls take a couple of minutes to enable it.

CNC connection component

FANUC and Heidenhain only: RTIndustry uses a small program that talks to the CNC. If it is missing, the antivirus has almost always quarantined it: restore it and add an exception for C:\RTIndustry (see Antivirus with its own firewall). Otherwise reinstall RTIndustry: data is kept.

OPC UA security (certificate and access)

  • Certificate rejected: download the RTIndustry certificate with the self-diagnosis buttons (PEM or DER) and have it approved on the control, moving it from rejected to trusted in the OPC UA server certificate list. Then run the check again: the connection restarts by itself.
  • User or password not accepted: check them with whoever manages the control and re-enter them in Machine and protocol › OPC UA security.
  • Connection not completed: Security mode and Security policy must be among those offered by the machine; try Detect the controller type in the node explorer.

Variable reading

Reads the configured variables (state, mode, part counter, program, alarms…).

  • No variable read: the profile does not match this control. Press Restore preset (with OPC UA try Detect the controller type) and then Test the changes before saving.
  • Some variables not read: they have a wrong address or do not exist on this control; fix them in Machine variables. The most important are machine state and part counter.

Machine state

Checks that the state value sent by the control is in the state table. If state not recognised appears, in Status and mode mapping · part counter add a row with the value shown and the right state (for example RUNNING if the machine is working). See also Machine and work order states.

Part counter

  • Part counter not read: enter the part counter variable in Machine variables, or enable counting at program end (see How parts are counted).
  • Invalid value (text, negative number): the variable points to the wrong data; with Modbus check register type and order.

Data received by the service

Tells how long the service has not received data from the machine. After one minute without data the machine shows as Off or not reachable. If the machine is on, follow the red checks above; if they are all green press Save in Settings to restart the connection. Slow or intermittent data usually means an unstable network (cable, switch).

Energy meter

Only if the meter is enabled. If it does not respond, check the meter's power supply and cable and, in Energy meter (Modbus), address, port, unit ID and register with Test reading (see Connecting the energy meter).

License

Shows the license status: trial, expiring, expired (read-only), blocked or missing. To activate or revalidate use Services, energy and license (Revalidate now); see License and messages.

Connection to the Site Manager (licenses)

RTIndustry checks the license over the internet. If the Site Manager does not respond the license stays valid for a few days, then data collection stops. Check that the PC can browse; if the company uses a proxy enter it in Services, energy and license › Company proxy; ask IT to allow HTTPS (port 443) to licenze.rtindustry.it.

Date, time and time zone

A clock that goes backwards or a time zone different from the one in Settings distort shifts and reports and can block the license. Correct the Windows date and time, enable Set time automatically and use the same time zone in Windows and in Services, energy and license › Time zone.

Disk space

Below 5 GB free a warning appears, below 1 GB a problem: with a full disk the database and backups stop. Free up space (temporary files, downloads, old files).

Database backup

Checks that the daily backup is recent and that the optional copy to another disk or network folder succeeds. Press Back up now in Services, energy and license; for a network copy read the note on permissions in Settings.

26Glossary

WO (work order)Production job: what to produce and in what quantity.
OEEOverall Equipment Effectiveness, the overall efficiency of the machine.
HMIHuman Machine Interface, the operator's screen.
CNCComputer numerical control of the machine tool.
PLCProgrammable logic controller.
Cycle timeTime to produce one part.
Target timeExpected cycle time, set in the work order.
Site ManagerThe supplier's online service that manages licenses.
ERP / MESEnterprise resource planning (company management system) / manufacturing execution system.
CSVData file that can be opened with Excel.
InstanceAn RTIndustry installation dedicated to one machine; several instances can run side by side on one PC.
Part counterCounter of the parts produced: the one in the machine's control, or calculated by RTIndustry at program end.
Energy meterElectrical instrument that measures the machine's consumption, read via Modbus TCP.
Wh / kWhWatt-hour / kilowatt-hour (1 kWh = 1000 Wh), units of the energy consumed.
Part programMachining program run by the machine tool.
Bill of materialsList of the materials needed to make one piece, with the quantities.
Scrap (material)Material lost in machining (offcuts, chips), as a percentage.
Consumption / purchase unitThe unit of the bill of materials (e.g. m²) and the one the material is bought and stocked in (e.g. kg).
Stock levelQuantity of a material in stock.
Recovery codeThe code that holds the company archive key: it is used to connect machines and to recover the data.

27Support

Before writing, run the Self-diagnosis: it solves most cases by itself (machine off or not reachable, certificate, license, disk).

For questions or problems contact the technician or reseller who installed RTIndustry, or write to assistenza@rtindustry.it.

When you ask for support, attach the diagnostics file: Settings › Export diagnostics button at the top. It contains version, software status and the latest operating messages, without passwords.

If the software does not open, attach instead the report of C:\RTIndustry\strumenti\Verifica-RTIndustry.bat (double-click it: it checks the PC, the network and the connection to the machine).

↑